River Ridge Board Greenlights Nearly $10 Million in Infrastructure Improvements
September 20, 2022
Jeffersonville, IN (September 19, 2022) – At this month’s meeting of the River Ridge Development Authority (RRDA), the board of directors approved several contracts, totaling almost $10 million, to further enhance local infrastructure in and around the River Ridge Commerce Center (RRCC). Highlights include:- $9,723,760 for the construction of a three-lane curb and gutter roadway (Penny Martin Lane), starting at 2nd Street and continuing to the railroad crossing north of Miami Trail, and ending at the existing 12th Street.
- More than $35,000 to build new sheltered bus stop locations and sidewalks to provide more effective employee and pedestrian accessibility.